▼ 17% off
CCI Quiet-22 22 LR 40gr Lead Round Nose 50 Rounds
$4.99 $0.10/rd 17% off MSRP 7 in
stock at 17 retailers
Compare Deals from 17 Retailers
Sorted by lowest price
Page 1 of 3
Specifications
Description
The CCI Quiet-22 is a 22 Long Rifle rimfire cartridge loaded with a 40-grain lead round nose bullet. It is intended for target shooting and plinking with bolt-action and single-shot 22 LR rifles.
Each round has a brass case and produces a rated muzzle velocity of 710 feet per second. The 40-grain lead round nose bullet is the standard profile for this class of rimfire ammunition. This box contains 50 rounds, and each case holds 100 boxes.
Because the cartridge is designed for 22 LR chambers, it is compatible only with rifles chambered for that caliber.
- Caliber: 22 LR
- Bullet Weight: 40 gr
- Bullet Type: Lead Round Nose (LRN)
- Case Material: Brass
- Muzzle Velocity: 710 fps
- Rounds Per Box: 50
- Boxes Per Case: 100
- Compatible Firearms: Bolt-action and single-shot 22 LR rifles
Price History
1-Month Historical
Range $4.45 - $6.99
Spread $2.54
Average $5.8
Median $5.99
Volatility 44.41%







