Home / Folding Knives / Magnum / Magnum Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle
Magnum Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle

Magnum Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle

Lowest Price
$42.77
MSRP
$45.99
Savings
7% off
In Stock at
0 Stores
Updated
Unavailable

Watch this deal

Get an email when price or stock moves on this product.

Improve this listing

Send structured deal feedback for moderator review.

Specifications

Brand
MPN
01SC080
UPC
788857750346

Description

Magnum Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle. Its simple slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r). Specifications for Magnum Long Lead EDC Folding Knife: Manufacturer: Magnum Blade Length: 3.15 in Blade Material: 8Cr13MoV Knife Application: Pocket Knife Overall Length: 7.24 in Blade Shape: Drop Point Handle Material: G10 Blade Finish: Uncoated Blade Thickness: 0.11 in Lock Type: SlipJoint Sheath Material: No Sheath Handle Color: Black Weight: 2.75 oz Opening Method: Nail Nick Package Type: Box Color: Black Package Contents: Magnum Long Lead EDC Folding Knife Magnum 01SC080: Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle
Stay Connected

Join our newsletter for the latest updates and exclusive deals.

ARMSAGORA

Compare prices on firearms, ammunition, and accessories from hundreds of trusted retailers. Find the best deals, track prices, and build your own loadouts.

© 2026 ARMSAGORA. All rights reserved.
Not an FFL licensed dealer. ARMSAGORA is a product comparison tool.