Product Details
MSRP $45.99
MPN 01SC080
UPC 788857750346
Description
Magnum Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle. Its simple slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r). Specifications for Magnum Long Lead EDC Folding Knife: Manufacturer: Magnum Blade Length: 3.15 in Blade Material: 8Cr13MoV Knife Application: Pocket Knife Overall Length: 7.24 in Blade Shape: Drop Point Handle Material: G10 Blade Finish: Uncoated Blade Thickness: 0.11 in Lock Type: SlipJoint Sheath Material: No Sheath Handle Color: Black Weight: 2.75 oz Opening Method: Nail Nick Package Type: Box Color: Black Package Contents: Magnum Long Lead EDC Folding Knife Magnum 01SC080: Long Lead EDC Folding Knife 3.15in 8Cr13MoV G10 Black Handle